Discussion about this post

User's avatar
Dave P's avatar

On the face of it that article by Sean Rush really does make the spin applied to this story by Newman as being a good old snow job. I’m sure all of the facts are in the meeting minutes which are all in the public domain. Any decent journalist should be able to pick these crumbs and show the actual time lines etc. ironically the new sludge minimisation plant was being constructed and as of December was scheduled to be commissioned in Feb this year ie like now. As far as I can see this project has not been mentioned in the articles ? It involves changing pipework so could be a wider range of failure points than just old veola not keeping up with maintenance? Seems a wide range of contractors would be on site? More likely a multi factor issue at a time when there are less fail safes available? Here is the MCD update https://www.mcconnelldowell.com/images/TWWP_Newsletter_Dec_2025_11.pdf

Will see if we get a decent public report or just another blame the greenies shitpost

Susie Vincent's avatar

Echoing John Walker, MT and others: (and Muriel Newman is a nasty piece of work IMHO).

Fascinating interviews on Kathryn Ryan on Thursday with senior water engineers. There was literally nobody with the water engineering expertise who could be called on to know what to do. Literally nobody. The operators running the plant hadn't got a clue when things went wrong. Sewage flooded the entire plant. One guy interviewed said all the systems will be 'munted'. And how do they stop the thing?

And yes, while there have been years of fluffing about and deferred maintenance/upgrading, Veolia is surely accountable. Emma Ricketts on Stuff (Wellington Wastewater Plant operator has faced overseas legal action) says it all: " . . . numerous scandals alleging mismanagement, poor maintenance and dangerous cost-cutting measures. Wellington Water commissioned a review itself in 2021, which raised concerns about understaffing, inexperience and a lack of oversight . . .".

And there is the oversight of the contractor. You have to have the in-house expertise to do this. Yes, Tui, it's about contracting out, axing the in-house understanding. This affects multiple, multiple contracts. Including that there are not even any quantity surveyors to check the costings on bids. Councils have no idea when they are being screwed - and they are. Like taking candy from a baby for the big companies concerned.

38 more comments...

Ready for more?